SAIDPUR AIRPORT

PROJECT DESCRIPTION

Location:  Nimphamari, Rangpur
Dates: 2018 – 2019
Status:  Completed
Client:  Civil Aviation Authority of Bangladesh
Size: 670 acres

(PROJECT COST: USD 205 MILLION APPROX.)

We provided all architectural and engineering services. The services rendered are as follows;

DEVELOPMENT OF SAIDPUR, BARISAL AND OSMANI INTERNATIONAL
AIRPORT PROJECTS (DESIGN PHASE)

• Topo Survey Work
• Prepare Feasibility Study Report,
• Environmental Impact Assessment Report (EIA), Architectural Presentation Drawings,
• Prepare Master plan, 3D drawings (Perceptions) and scale paper model,
• Architectural working drawing and detailing,
• Structural design and drawing,
• Plumbing and sanitary design including the water supply and sanitation system STP (Sewerage Treatment Plant),
• HVAC design including the air-conditioning ducting drawing and central ventilation system,
• Fire fighting design including the fire detection system, fire sprinkler, hydrant and other suppression system,
• Preparation of Bill of quantities (BOQ) and specification, Bid Documents.
SAIDPUR INTERNATIONAL AIRPORT
• Infrastructure necessary to develop Saipur Airport into regional/international airport and make suitable for operation of wide body aircrafts like B777 type aircrafts.