OSMANI INTERNATIONAL AIRPORT

PROJECT DESCRIPTION

(PROJECT COST: USD 225 MILLION APPROX.)

Location:  Sylhet
Dates: 2018 – 2019
Status:  Completed
Client:  Civil Aviation Authority of Bangladesh
Size: 822 acres

We provided all architectural and engineering services. The services rendered are as follows;

DEVELOPMENT OF SAIDPUR, BARISAL AND OSMANI INTERNATIONAL
AIRPORT PROJECTS (DESIGN PHASE)

• Topo Survey Work
• Prepare Feasibility Study Report,
• Environmental Impact Assessment Report (EIA), Architectural Presentation Drawings,
• Prepare Master plan, 3D drawings (Perceptions) and scale paper model,
• Architectural working drawing and detailing,
• Structural design and drawing,
• Plumbing and sanitary design including the water supply and sanitation system STP (Sewerage Treatment Plant),
• HVAC design including the air-conditioning ducting drawing and central ventilation system,
• Fire fighting design including the fire detection system, fire sprinkler, hydrant and other suppression system,
• Preparation of Bill of quantities (BOQ) and specification, Bid Documents.

OSMANI INTERNATIONAL AIRPORT
Passenger Terminal Building; Passenger Apron; Cargo Building; Cargo Yard Design; Custom Offices; Medical Center; Cargo Apron; Rescue and firefighting station; Approach & Internal Roads; Car parks; Drainage work (Culvert, drain etc.); Boundary wall; Water supply system; Sewage Treatment Plant;

Water Treatment plant; Rigid Pavement Work Flexible Pavement Work; Intake Power Plant with distribution system; Cargo equipment; AGL Hydrant fuel system; Operation building with control tower; Administrative Building; Maintenance Building; AFL station; Residential Quarters Utility Station (AC Plant Room); Generator & transformer room: Water pump room & Deep well room; Landscaping & Beautification Work; and other ancillary works.